With the drive to reduce and even eliminate the use of fossil-fuelled plant and machinery on trackside projects, Trime have designed and developed a zero emission lighting set entitled the Trime X-Rail Kit.
The X-Rail Kit comprises of nine strong connectable masts, a 200 amp/hour lithium battery, and a battery recharging pack. The battery and battery-pack each feature useful carrying handles and is enclosed in sturdy casing. Also included in the X-Rail Kit are nine connection cables each 12-metre in length. The X-Rail Kit is entirely portable, with the individual masts weighing just 12kg, and the battery and battery-pack both weigh 13kg.
The energy saving LED lamps deliver up to 1300 square metres of illumination, which will operate for over 40 hours on one single charge. The complete unit can be recharged in only 3 hours 40 minutes.
The Trime X-Rail Kit uses no fuel, emits zero emissions and operates completely silently. Up to 42 X-Rail Kits can be transported on one single truck. Preparing a series of X-Rail Kits for use on a trackside project is quick and uncomplicated.
The Trime X-Rail Kit is just one product in the expanding Trime T-Zero pro range of sustainable equipment, and is available direct from the manufacturer.
The Trime Group has over 50 years of experience in the manufacture, development and marketing of environmentally sustainable lighting sets for the rail, off-shore, event, construction and rental markets. Trime equipment is distributed worldwide. Trime UK is headquartered in Huntingdon, Cambridgeshire; their manufacturing plant is based near Milan, Italy.